BRIDGES, UNDERPASS AND ROADS

img img

Concept Design of Sunda Strait Bridge. Main span: 2016 m & 1224 m with span of viaduct 150 m

img img

Basic Design for Viaduct of Sunda Strait Bridge (span: 150 m, total length: 21 km)

img img

Mahakam Ulu Steel Arch Bridge

Structure Design

img img

Balang Island Arch Bridge in East Kalimantan

Proof Checking for redesigned structure

img img

Summarecon Ahmad Yani Flyover (Bekasi)

Structural Proof Checking & Redesign

img img

Detailed Design for Long-span Balang Island Cable Stayed Bridge. Main span: 402 m

img img

Design for Cable Stayed Bridge at Batu Lubang, Center Tapanuli, North Sumatera (span: 62 m)

img img

Grand Wisata Cable Stayed Overpass, Bekasi Timur, West Java. Main span: 81 m

Design and Supervision

img img

Soekarno Cable Stayed Bridge in Manado, North Sulawesi (main span: 2 x 120 m)

Construction Engineering, Deflection Control

img img

Concept Design of Balikpapan Bay Bridge between Balikpapan and Penajam. Main span: 450 m, total length: 6,4 km

img img

Kelok 9 Bridge (Balance Cantilever) in West Sumatra

Construction Engineering

img img

Mahkota II Cable Stayed Bridge in Samarinda, East Kalimantan (main span: 350 m)

IPC (Independent Proof Check)

img img

Design for Tulur Aji Jejangkat Cable Stayed Bridge, West Kutai, East Kalimantan (main span: 340 m)

img img

Cisadane Cable Stayed Bridge, Serpong, West Java. Main span: 2 x 100 m

Structure Design

img img

Sangkulirang Bridge at Sangatta, East Kutai, East Kalimantan

Structure Design

img img

Wind Tunnel Test for Melak Cable Stayed Bridge (main span: 340 m) in cooperation with Tongji University in Shanghai, China

img img

Megamal Bridge, Pluit, North Jakarta

Structure Design

img img

Haji Terminal at Soekarno-Hatta Airport, Cengkareng

Design and Supervision for Bridge, Underpass, and Access Road

img img

Mahakam 4 Bridge in Samarinda, East Kalimantan (total length: 400 m, main span: 220 m)

IPC (Independent Proof Check)

img img

Teluk Balikpapan Suspension Bridge (810 meters span), East Kalimantan

Basic Design

img img

Wind Tunnel Test for Balang Island Bridge

img img

Highway Fly-over 950 meters in Daan Mogot Interchange, West Jakarta

Structure Design

Komplek Kirana Boutique Blok D3 No. 8, Jl. Boulevard Raya, Kelapa Gading Timur, Jakarta Utara 14240

(+6221)2452-5820

office@pcg-partonofondas.com

Copyright © 2022 Designed by conceptx.live
EnglishBahasa IndonesiaPortuguês